NoFloods AluGate Products

Home > NoFloods AluGate Products

NoFloods AluGate Models

Posts

Types Material Sealing Strip Material Protection Height Weight Bolts
Inside mounted, Outside mounted, Centre, 90 degrees
6063 T-6 Aluminium
Rubber EPDM
Up to 2 meters
2 kg/m + top cap and seal
Stainless steel

Planks

Material Sealing Strip Material Length Height Weight
6063 T-6 Aluminium
Rubber EPDM
Varies depending on opening size
200 mm with (Standard)
2.85 kg/m

Barrier Anchor and Support

Component Description / Recommendation
Center Post Support Legs
For barriers with retention heights above 60 cm
Plank Support Legs
Recommended for barrier heights above 1 meter.
304 stainless steel Post Base Plate
For optimal anchoring of centre / free standing posts
304 Stainless steel Barrier Base Plate
Ensures an even surface under the planks

Discover the full capabilities of the NoFloods AluGate in our catalogues, where you’ll find detailed specifications, installation guidance, and real-world examples of how this innovative system delivers sustainable, reusable flood protection without compromising aesthetics or accessibility.

How to Install the AluGate Barrier

Before installing the wall mounted barrier, determine whether you want to place the posts inside the opening or outside of it. For optimal installation and use of the AluGate, always refer to the user manual for detailed instructions and guidelines.

01.

Installation

  • Ensure that the outside rubber seals are facing the wall where the post will be installed, and that the U-channel opening is directed toward the opening, ready to receive a plank.
  • Use a hammer drill to create holes for the included expanding wall anchors.
  • Insert and expand the anchors to secure the posts to the wall.
  • Ensure the anchors are inserted into a solid concrete, cinderblock, or cement wall for optimal system stability.
02.

Connection of units

  • Loosen the tightening bolts and the top locking bracket.
  • Ensure that the planks are positioned with the rubber seal facing downwards.
  • Continue to insert planks until all the planks are in position, ready for tightening.
  • Note: The plank with the the reflective warning tape should be inserted as the last one on top.
03.

Connecting & Locking

  • Use the included Allen wrench to tighten flood planks into position and against the internal rubber seals.
  • Insert the top locking clamps into the post top slot. Use the Allen wrench to tighten down the clamps and to apply pressure to flood planks below, enhancing the seal between slats.
  • Use the tightening bolts on the posts to tighten down the planks within the U-channel and to ensure a seal with the neoprene strips within the channel.
04.

Disassembly

Loosen top locking clamps and tightning bolts and remove planks in the reverse order. Clean off any debris, dry and store away.

Scroll to Top